Summary dashboard · method by Grant Resource Studio

Mill Lane Community Kitchen CIC

A one-screen companion to the written review. This is not the funder's own assessment, and it is not a prediction of an award. The findings are the 20 September 2026 teaching report. This page uses the public dashboard shape.

Review date: 20 September 2026 Run: mill-lane-northbridge-2026-09-20 Working mode: external Northbridge Community Fund 2026
Overall judgement
Further development
Further development or evidence required
Hard-gate check
Not clean
2 confirmed disqualifications. 2 correctable blockers. 1 unresolved check.
Funder criteria
Red
Overall Layer 1 position
Ask versus arithmetic
£9,800
Lines add to £10,600. Published maximum £8,000.

Do not submit this draft

  1. The budget lines sum to £10,600, not the stated £9,800.
  2. The request is £9,800 against a published maximum of £8,000.
  3. Sessions are already running, against a published exclusion.
  4. The figure of 2,000 unique beneficiaries is specific and unchecked.

Hard-gate check

Problems serious enough that they are never averaged into a score.

Confirmed disqualification

Correctable submission blocker

Unresolved mandatory check

Non-blocking improvement

None in this extract.

This funder's criteria

Green: met as the application standsAmber: addressed, with a gap an assessor would noticeRed: not met, or a material weakness

Amber

Need

Library cafe closure is concrete. Scale of need is asserted.

Red

Involvement of people affected

Listening is not the same as shaping the design.

Red

Realistic delivery

Already started, broken budget, CIC a few months old.

Who this funder has supported

Source

No published list

Northbridge Community Fund is invented for this example.

Pattern

None

No organisations were guessed.

One change

No change

No change recommended from this check.

Independent quality

0 does not meet1 strong reservations2 some reservations3 meets adequately4 strong5 exceptional

Evidence and specificity
2 / 5
2,000 unique beneficiaries is precise and unsupported.
Narrative logic
2 / 5
Already-started sessions against the funder's exclusion.
Completeness
3 / 5
Each extract question has an answer.
Drafting compliance
2 / 5
Request and start date sit outside published rules.
Tone and voice
3 / 5
Plain, with a generic credibility line.

Each application answer

QuestionCountKeepChange
1 What you want to doshort extractClear activity and venue.Already-started claim. Rewrite around work that has not begun, or choose a different funder.
2 Who will benefitshort extractNamed groups.2,000 unique people needs a source or a smaller, checkable figure.
3 How people have shaped the workshort extractA reason for starting.Involvement is asserted, not described.
4 Why this organisationshort extractIncorporation date is stated.Track record is a director's catering background, not kitchen sessions.
5 BudgettableLine names are clear.Arithmetic and coordinator rate do not hold. Request exceeds the published maximum.
Organisational readinessRead only from the face of the text: incorporation date and the staffing claim. The written report holds that short check. No accounts or public-register record were supplied.

Work in this order

  1. Bring the request inside the published range, or stop£2,000 to £8,000.
  2. Recast already-started activityThe funder excludes activity that has already begun.
  3. Make the budget add upThen replace or source the 2,000 figure, and describe how people affected shaped the design.

Find the full report

The evidence register, the method statement and any knowledge diagnostic live only in the markdown file.

Mill Lane Community Kitchen CIC - Application Review (20 September 2026).md

Review date
20 September 2026
Run identifier
mill-lane-northbridge-2026-09-20
Draft reviewed
Mill Lane Community Kitchen CIC - application extract.md
Working mode
External
Public method
Edition 0.3, 28 September 2026. Page shape updated 29 September 2026.